Electrical Estimating Software

Bid a house in
5 minutes.

Material list, wire runs, breaker schedule. Done.

Try Free for 14 Days

Plans start at $69/month. New graduates lock in 43% off Pro+ for 2 years.

Calibrated against real residential and commercial bids that were actually built, ranging from $33,000 to $748,000. The numbers are not guesses.

NEWNew Graduate Bundle

Just got licensed? Save up to 43% off Pro+ for 2 years.

14 days free, locked-in bundle pricing for 24 months, money-back if you don’t land paid work using it.

See if you qualify
24-minute walkthrough

See the full workflow.

Estimate, draw, and permit a real residential job from start to finish.

New · Volt AI agent

Tell Volt what to change. Click Apply.

Volt is your in-product editor. Talk to it like an apprentice who knows the code book. Bump a quantity, change the labor rate, add a trip charge, remove a line item. Volt proposes every edit as a one-click Apply card. Nothing saves until you confirm.

Bump the master bedroom outlets to 6 and set labor to $95/hr.
Two changes coming up. Review and click Apply when you're ready.
Proposed changes (2)
  • Set "Master Bedroom outlets" qty: 4 → 6
  • Set labor rate: $85.00/hr → $95.00/hr
The shift

From paper chaos to one clean workflow.

Drag the slider. The desk on the right is what your morning looks like with The Volt Planner.

See the difference

Paper chaos vs. one clean workflow.

Cluttered desk with paper estimates and hand-drawn electrical plansClean desk with laptop showing digital electrical floor plan software
The old way

Tap Before / After above to compare

How it works

Four steps from room list to permit.

From walk-through to filed permit, in one afternoon. The same workflow every job.

Step 01

Estimate

Pick rooms. Set quantities. Get a full material and labor breakdown with NEC defaults.

Outlets ×6$142
GFCI ×2$96
14/2 Wire 420ft$105
TOTAL$502
Step 02

Draw

One click turns your estimate into a floor plan with ANSI/IEEE symbols, ready to drag and edit.

Step 03

Permit

Cover, NEC 220.82 load calc, conductor sizing, panel schedule. A 4-page PDF the inspector wants.

Step 04

Submit

Export the four-page permit package. Submit to your city. Auto-submit to the Tampa portal coming soon.

▸ UPLOAD COMPLETE▸ 4 PAGES VERIFIED▸ JOB #4827 FILED▸ AWAITING REVIEW_
Your next bid is waiting

Price it. Draw it. Permit it. Done.

Price it. Draw it. Permit it. The full workflow in one tool. New grads lock in 43% off for two years.

No commitment. Cancel anytime during your trial.